Authors
Fabiano André Trein, Fernando Amaral
Publication date
2001
Journal
Encontro Nacional de Engenharia de Produção
Volume
21
Pages
1-8
Description
The new developed plan was evaluated comparatively to the existing layout using the “Score” technique. The results obtained sign the re-layout of the workstations with material flow reduction in according to proximates stations with high level of relationships. This improvement has reached a better space disposal of the workstations and a better production control through the natural batch separation.
Total citations
2003200420052006200720082009201020112012201320142015201620172018201920202021202220231131223111211