Authors
Shijin Wang, Ming Liu
Publication date
2013/1/1
Journal
Computers & Operations Research
Volume
40
Issue
1
Pages
438-450
Publisher
Pergamon
Description
This paper considers a two-stage hybrid flow shop scheduling problem with dedicated machines, in which the first stage contains a single common critical machine, and the second stage contains several dedicated machines. Each job must be first processed on the critical machine in stage one and depending on the job type, the job will be further processed on the dedicated machine of its type in stage two. The objective is to minimize the makespan. To solve the problem, a heuristic method based on branch and bound (B&B) algorithm is proposed. Several lower bounds are derived and four constructive heuristics are used to obtain initial upper bounds. Then, three dominance properties are employed to enhance the performance of the proposed heuristic method. Extensive computational experiments on two different problem categories each with various problem configurations are conducted. The results show that …
Total citations
2013201420152016201720182019202020212022202320242615866387622