Authors
Feng Wang, Chun Chen, Canbing Li, Yijia Cao, Yong Li, Bin Zhou, Xuzhu Dong
Publication date
2016/3/8
Journal
IEEE transactions on smart grid
Volume
8
Issue
6
Pages
2627-2636
Publisher
IEEE
Description
A fast and effective service restoration method is proposed for medium-voltage distribution system with distributed generators by combining intentional islanding of distributed generators with network reconfiguration to maximize restoration of out-of-service loads. The whole process is divided into four stages: 1) matching islanding schemes; 2) restoration of network connectivity and distributed generators; 3) network reconfiguration; and 4) optimization of load shedding. Whether the last three stages are executed or not depends on violations of operational constraints. In accordance with the topological feature of distribution system, a new concept of fundamental loop matrix is presented and applied in detecting out-of-service areas, restoration of network connectivity, and network reconfiguration. Simulation studies on the PG&E 69-bus system shows the effectiveness of the proposed approach.
Total citations
20172018201920202021202220232024311152817171814
Scholar articles
F Wang, C Chen, C Li, Y Cao, Y Li, B Zhou, X Dong - IEEE transactions on smart grid, 2016