Authors
Antonio Lova, Pilar Tormos
Publication date
2002/4/3
Journal
Proceedings of the Eight International Workshop on Project Management and Scheduling
Pages
244-248
Publisher
Valencia, Spain
Description
In practice, organizations work in general on more than one project which share some or all the available resources. In this work hybrid heuristics that combine Random Sampling heuristics and Backward-Forward methods are developed for the Resource-Constrained Multi-Project Scheduling Problem (RCMPSP). This heuristic approach has been successfully applied to resource-constrained single project scheduling when the objective to optimize is makespan. In this work, the mean project delay and the multi-project duration increase criteria are considered. The heuristics proposed includes several parameters which effect is analyzed through a wide computational study. The best configuration of these parameters is reported when considering both criteria.
Total citations
2001200220032004200520062007200820092010201120122013201420152016201720182019202020212022132222451421531212
Scholar articles