Authors
Ming Liu, Lijie An, Jiantong Zhang, Feng Chu, Chengbin Chu
Publication date
2019/10/2
Journal
International Journal of Production Research
Volume
57
Issue
19
Pages
5974-5995
Publisher
Taylor & Francis
Description
This paper investigates a multi-module reconfigurable manufacturing system for multi-product manufacturing. The system consists of a rotary table and multiple machining modules (turrets and spindles). The production plan of the system is divided into the system design phase and the manufacturing phase, where the installation cost and the energy consumption cost correspond to the two phases, respectively. A mixed-integer programming model for a more general problem is presented. The objectives are to minimise the total cost and minimise the cycle time simultaneously. To solve the optimisation problem, the ε-constraint method is adopted to obtain the Pareto front for small size problems. Since the ε-constraint method is time consuming when problem size increases, we develop a multi-objective simulated annealing algorithm for practical size problems. To demonstrate the efficiency of the proposed algorithm …
Total citations
20192020202120222023202441012761
Scholar articles