Authors
Shijin Wang, Ming Liu
Publication date
2015/10/1
Journal
Journal of Manufacturing Systems
Volume
37
Pages
182-192
Publisher
Elsevier
Description
Many studies on the integration optimization of production scheduling and preventive maintenance usually only consider one resource, i.e., machine. However, in real-world manufacturing, multiple dependent resources (e.g., human, tools and machines) are needed at the same time to avoid mismatch of multi-resource usage, which makes it highly important to jointly schedule production and maintenance tasks of multiple resources in order to improve system availability and system throughput simultaneously. In this paper, a multi-objective parallel machine scheduling problem with two kinds of resources (machines and moulds) and with flexible preventive maintenance activities on resources are investigated. The objective is to simultaneously minimize the makespan for the production aspect, the unavailability of the machine system, and the unavailability of the mould system for the maintenance aspect. A multi …
Total citations
2016201720182019202020212022202320245111119152326138