Authors
Kelvin Ching Wei Lim, Li-Pei Wong, Jeng Feng Chin
Publication date
2022/8/25
Journal
Engineering Optimization
Pages
1-17
Publisher
Taylor & Francis
Description
The flexible job-shop scheduling problem (FJSP) is common in high-mix industries such as semiconductor manufacturing. An FJSP is initiated when an operation can be executed on a machine assigned from a set of alternative machines. Thus, an FJSP consists of the machine assignment and job sequencing sub-problems, which can be resolved using a pair of problem-dependent machine assignment rules (MARs) and job sequencing rules (JSRs). Selecting an MAR–JSR pair that performs efficiently is a challenge. This study proposes a simulated-annealing-based hyper-heuristic (SA-HH) for assembling an heuristic scheme (HS) consisting of MAR–JSR pairs with a set of problem state features. Two variants of SA-HH, i.e. SA-HH based on HS with problem state features (SA-HH) and without problem state features (SA-HH), are investigated. In terms of the best makespan, SA-HH outperforms or is …
Total citations
2022202320241611
Scholar articles