Authors
Juan Yu, Wei Yan, Wenyuan Li, CY Chung, KP Wong
Publication date
2008/1/21
Journal
IEEE Transactions on Power Systems
Volume
23
Issue
1
Pages
170-176
Publisher
IEEE
Description
A novel AC-DC optimal reactive power flow (ORPF) model with the generator capability limits is proposed. The objective is to minimize the total cost of generator reactive and active power outputs paid by an independent transmission company. In the model, the generator operation area is divided into four parts with each one having a different reactive output cost function. The boundaries between the four parts change with operation states of generators and are unfixed. The model is an unfixed piecewise mixed-integer nonlinear programming problem. A heuristic approach is introduced into the interior point method to solve the unfixed piecewise problem. The numerical results of six test systems that range in size from 14 to 2572 buses demonstrate the effectiveness of the proposed method.
Total citations
200920102011201220132014201520162017201820192020202120222023202413134271652426672541
Scholar articles