Authors
A Oppelt, K Abrahamyan, G Asova, J Bähr, G Dimitrov, U Gensch, H-J Grabosch, JH Han, S Khodyachykh, M Krasilnikov, S Liu, V Miltchev, B Petrosyan, S Riemann, L Staykov, F Stephan, Mv Hartrott, E Jaeschke, D Krämer, D Lipka, F Marhauser, D Richter, K Flöttmann, S Schreiber, T Garvey, L Catani, E Chiadroni, A Cianchi, L Palumbo, D Alesini, M Boscolo, G Di Pirro, M Ferrario, D Filippetto, C Vicario, P Michelato, L Monaco, C Pagani, D Sertore, V Boccone, N Pavel, VV Paramonov, I Tsakov, G Klemz, W Sandner, I Will, W Ackermann, WFO Müller, S Schnepp, T Weiland, J Rönsch, J Rossbach
Publication date
2005
Conference
27th International Conference on Free Electron Lasers, FEL2005
Issue
eConf C0508213: THPP043, 2005
Pages
564-567
Publisher
Joint Accelerator Conferences Website
Description
Since December 2004, the photo injector test facility at DESY in Zeuthen (PITZ) has been upgraded. A normal conducting copper booster cavity has been installed and the diagnostics beamline has been strongly modified. An extended water cooling system has been installed and was successfully taken into operation. Actually, the new diagnostics elements are being commissioned. After the installation of the new 10 MW klystron in June/July, the gun can be conditioned towards higher average power, and the whole beamline including the booster will be taken into operation. First results from the commissioning phase including gun and booster conditioning are reported.
Total citations
200520062007200820092010201120122013201420152016201746431211
Scholar articles
A Oppelt, K Abrahamyan, G Asova, J Bähr, G Dimitrov… - 27th International Conference on Free Electron Lasers …, 2005