Authors
Mohamad Hazem AL Mousli, Sameh Monir El-Sayegh
Publication date
2016/9/2
Journal
Architectural Engineering and Design Management
Volume
12
Issue
5
Pages
353-366
Publisher
Taylor & Francis
Description
Design–construction interface problems impede the successful delivery of construction projects within the specified time, cost and quality. The objective of this paper is to assess the design–construction interface problems in the United Arab Emirates (UAE) construction industry. Twenty-two problems were identified through literature review. A questionnaire survey was then developed and distributed to construction professionals. Thirty-nine responses were collected from consultants, contractors and construction professionals in government authorities. The weighted average of the responses was calculated. The results reveal that the most significant interface problems in the UAE include lack of coordination inside the design firm, lack of specialist construction manager, poorly written contract, lack of project management as individual professional service and time limitation in the design phase. Moreover, the paper …
Total citations
2017201820192020202120222023202456759764
Scholar articles
MH AL Mousli, SM El-Sayegh - Architectural Engineering and Design Management, 2016