Authors
Zhe Chen, Frede Blaabjerg, Y Hu
Publication date
2005
Book
Proceedings of IPEC’05
Description
The fast development of wind power generation presents new requirements for the wind turbines integrated into the network. After the clearance of an external short-circuit fault, the voltage at the generator terminal needs to be re-established and the wind turbine should restore its normal operating condition quickly for power system stability. This paper studies the voltage recovery of a dynamic slip and turbine pitch controlled wind turbine. A simulation model of a dynamic slip controlled wind turbine in PSCAD/EMTDC is presented, and the control schemes are described. The function of a STATCOM in re-establishing the system voltage after the clearance of an external short-circuit fault and restoring the normal operation of the wind turbine has been investigated.
Total citations
200520062007200820092010201120122013201420152016201720182019202020213362661121522
Scholar articles