Authors
Young Hoon Lee, Michael Pinedo
Publication date
1997/8/1
Journal
European Journal of Operational Research
Volume
100
Issue
3
Pages
464-474
Publisher
North-Holland
Description
Consider a number of jobs to be processed on a number of identical machines in parallel. A job has a processing time, a weight and a due date. If a job is followed by another job, a setup time independent of the machine is incurred. A three phase heuristic is presented for minimizing the sum of the weighted tardinesses. In the first phase, as a pre-processing procedure, factors or statistics which characterize an instance are computed. The second phase consists of constructing a sequence by a dispatching rule which is controlled through parameters determined by the factors. In the third phase, as a post-processing procedure, a simulated annealing method is applied starting from a seed solution which is the result of the second phase. In the dispatching rule of the second phase there are two parameters of which the values are dependent on the particular problem instance at hand. Through extensive experiments …
Total citations
1997199819992000200120022003200420052006200720082009201020112012201320142015201620172018201920202021202220232024227771611171421201924262433311117151410151616131311
Scholar articles