Authors
Mousa Mohammadi, Piyush Rai, Kazem Oraee, Manish Kumar
Publication date
2013
Journal
Proceedings of the 23rd World Mining Congress, Montreal
Pages
55-78
Description
Due to operational advantage of dragline in simultaneous excavation and back-filling, the equipment has gained vast importance in open-pit mining. Besides, absence of auxiliary haulage units and a myriad of other benefits are also credited in favor of excavation of muck piles by the draglines. However, the aspects of production, productivity and economics are of utmost significance in dragline operation and planning. In this light, the present paper is an endeavor to analyze availability and utilization of dragline operations. The paper presents a good amount of data for 4-draglines operating in one of the major opencast projects in India. The study reveals the trends of availability and utilization of these draglines during last 11-years. Furthermore, the study also highlights the salient reasons for loss of available hours and for idling of the draglines. Some startling information and facts have been illustrated in form of graphs and pie charts.
Total citations
201520162017201820192020202120222023202433111111
Scholar articles