Follow
David Canca
Title
Cited by
Year
Arrival and service time dependencies in the single-and multi-visit selective traveling salesman problem
D Canca, E Barrena, G Laporte
Computers & Operations Research 166, 106632, 2024
2024
Operational Research: methods and applications
F Petropoulos, G Laporte, E Aktas, SA Alumur, C Archetti, H Ayhan, ...
Journal of the Operational Research Society 75 (3), 423-617, 2024
112024
Demand-adapted train timetabling with coupling-decoupling operations on a bidirectional intercity railway line
J Liu, D Canca, H Lv, S Ni
Computers & Industrial Engineering 189, 109999, 2024
2024
A Multilayer Network Approach for the Bimodal Bus–Pedestrian Line Planning Problem
D Canca, B Navarro-Carmona, G Villa, A Zarzo
Mathematics 11 (19), 4185, 2023
2023
Spatiotemporal synchronous coupling algorithm for urban rail transit timetables design under dynamic passenger demand
J Liu, D Canca, H Lv
Applied Mathematical Modelling 119, 239-256, 2023
32023
Analysis of the selective traveling salesman problem with time-dependent profits
E Barrena, D Canca, LC Coelho, G Laporte
Top 31 (1), 165-193, 2023
62023
Design and assessment of an urban circular combined truck–drone delivery system using Continuum approximation models and integer programming
D Canca, B Navarro-Carmona, JL Andrade-Pineda
Sustainability 14 (20), 13459, 2022
32022
The stochastic team orienteering problem with position-dependent rewards
J Panadero, E Barrena, AA Juan, D Canca
Mathematics 10 (16), 2856, 2022
12022
A multi-agent approach to the truck multi-drone routing problem
JM Leon-Blanco, PL Gonzalez-R, JL Andrade-Pineda, D Canca, M Calle
Expert Systems with Applications 195, 116604, 2022
492022
An assessment of European electricity arbitrage using storage systems
F Núñez, D Canca, Á Arcos-Vargas
Energy 242, 122916, 2022
252022
Solving real-size stochastic railway rapid transit network construction scheduling problems
D Canca, G Laporte
Computers & Operations Research 138, 105600, 2022
52022
An Iterated Greedy Matheuristic for Solving the Stochastic Railway Network Construction Scheduling Problem
D Canca, G Laporte
XI International Workshop on Locational Analysis and Related Problems, 31, 2022
2022
A quantitative approach for the long-term assessment of Railway Rapid Transit network construction or expansion projects
D Canca, JL Andrade-Pineda, A De-Los-Santos, PL González-R
European Journal of Operational Research 294 (2), 604-621, 2021
82021
Mathematical formulations for the bimodal bus-pedestrian social welfare network design problem
A De-Los-Santos, D Canca, E Barrena
Transportation research part B: methodological 145, 302-323, 2021
162021
Business opportunities in the day ahead markets by storage integration: An application to the German case
Á Arcos-Vargas, D Canca, F Núñez
Mathematical Modelling of Contemporary Electricity Markets, 209-224, 2021
2021
An assessment of European electricity arbitrage using storage systems
F N'u, D Canca, A Arcos-Vargas
arXiv. org Papers, 2020
2020
An assessment of European electricity arbitrage using storage systems
D Canca
arXiv. org, 2020
2020
Scheduling a dual-resource flexible job shop with makespan and due date-related criteria
JL Andrade-Pineda, D Canca, PL Gonzalez-R, M Calle
Annals of operations research 291, 5-35, 2020
602020
Truck-drone team logistics: A heuristic approach to multi-drop route planning
PL Gonzalez-R, D Canca, JL Andrade-Pineda, M Calle, JM Leon-Blanco
Transportation Research Part C: Emerging Technologies 114, 657-680, 2020
1782020
Impact of battery technological progress on electricity arbitrage: An application to the Iberian market
Á Arcos-Vargas, D Canca, F Núñez
Applied Energy 260, 114273, 2020
412020
The system can't perform the operation now. Try again later.
Articles 1–20