Follow
Pilar Tormos
Title
Cited by
Year
11 THE EVOLUTION OF SOFTWARE
C Maroto, P Tormos, A Lova
Project Scheduling: Recent Models, Algorithms and Applications 14, 239, 2012
2012
A competitive heuristic solution technique for resource-constrained project scheduling
P Tormos, A Lova
Annals of Operations Research 102, 65-81, 2001
2562001
A decision support system (DSS) for the railway scheduling problem
L Ingolotti, P Tormos, A Lova, F Barber, MA Salido, M Abril
Artificial Intelligence Applications and Innovations: IFIP 18th World …, 2004
92004
A Decision Support System for railway timetabling (MOM): the Spanish case
M Abril, F Barber, P Tormos, A Lova, L Ingolotti, MA Salido
Computers in Railways X: Computer System Design and Operation in the Railway …, 2006
182006
A dynamic population steady-state genetic algorithm for the resource-constrained project scheduling problem
M Cervantes, A Lova, P Tormos, F Barber
New Frontiers in Applied Artificial Intelligence: 21st International …, 2008
242008
A genetic algorithm for railway scheduling problems
P Tormos, A Lova, F Barber, L Ingolotti, M Abril, MA Salido
Metaheuristics for scheduling in industrial and manufacturing applications …, 2008
1102008
A genetic approach to robust train timetabling
MP Tormos, AL Lova, LP Ingolotti, F Barber
Technical Report ARRIVAL-TR-0173, Arrival Project, 2008
102008
A Heuristic Technique for the Capacity
M Abril, MA Salido, F Barber, L Ingolotti, A Lova, P Tormos
A heuristic technique for the capacity assessment of periodic trains
M Abril, MA Salido, F Barber, L Ingolotti, A Lova, P Tormos
Artificial Intelligence Research and Development, 339-346, 2005
152005
A hybrid genetic algorithm for the multi-mode resource constrained project scheduling problem
A Lova, P Tormos, M Cervantes, F Barber
Proceedings of the Eleventh International Workshop on Project Management and …, 2008
32008
A multicriteria heuristic method to improve resource allocation in multiproject scheduling
A Lova, C Maroto, P Tormos
European journal of operational research 127 (2), 408-424, 2000
2622000
A scheduling order-based method to solve timetabling problems
L Ingolotti, F Barber, P Tormos, A Lova, MA Salido, M Abril
Current Topics in Artificial Intelligence: 11th Conference of the Spanish …, 2006
82006
A Topological model based on railway capacity to manage periodic train scheduling
MA Salido, F Barber, M Abril, P Tormos, A Lova, L Ingolotti
International Conference on Innovative Techniques and Applications of …, 2004
62004
An assessment of railway capacity
M Abril, F Barber, L Ingolotti, MA Salido, P Tormos, A Lova
Transportation Research Part E: Logistics and Transportation Review 44 (5 …, 2008
6492008
An efficient adaptative heuristic for the resource constrained project scheduling problem
A Lova, P Tormos, M Cervantes, FB Sanchís
XII Conferencia de la Asociación Española para la Inteligencia Artificial …, 2007
42007
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes
A Lova, P Tormos, M Cervantes, F Barber
International Journal of Production Economics 117 (2), 302-316, 2009
2412009
An efficient method to schedule new trains on a heavily loaded railway network
L Ingolotti, F Barber, P Tormos, A Lova, MA Salido, M Abril
Advances in Artificial Intelligence–IBERAMIA 2004: 9th Ibero-American …, 2004
342004
An efficient multi-pass heuristic for project scheduling with constrained resources
P Tormos, A Lova
International Journal of Production Research 41 (5), 1071-1086, 2003
1192003
An integration model for planning and scheduling problems with constrained resources
P Tormos, F Barber, A Lova
8th International Workshop on Project Management and Scheduling, 2002
52002
An interactive train scheduling tool for solving and plotting running maps
F Barber, MA Salido, LP Ingolotti, M Abril, AL Lova, MP Tormos
Current Topics in Artificial Intelligence: 10th Conference of the Spanish …, 2004
272004
The system can't perform the operation now. Try again later.
Articles 1–20