11 THE EVOLUTION OF SOFTWARE C Maroto, P Tormos, A Lova Project Scheduling: Recent Models, Algorithms and Applications 14, 239, 2012 | | 2012 |
A competitive heuristic solution technique for resource-constrained project scheduling P Tormos, A Lova Annals of Operations Research 102, 65-81, 2001 | 256 | 2001 |
A decision support system (DSS) for the railway scheduling problem L Ingolotti, P Tormos, A Lova, F Barber, MA Salido, M Abril Artificial Intelligence Applications and Innovations: IFIP 18th World …, 2004 | 9 | 2004 |
A Decision Support System for railway timetabling (MOM): the Spanish case M Abril, F Barber, P Tormos, A Lova, L Ingolotti, MA Salido Computers in Railways X: Computer System Design and Operation in the Railway …, 2006 | 18 | 2006 |
A dynamic population steady-state genetic algorithm for the resource-constrained project scheduling problem M Cervantes, A Lova, P Tormos, F Barber New Frontiers in Applied Artificial Intelligence: 21st International …, 2008 | 24 | 2008 |
A genetic algorithm for railway scheduling problems P Tormos, A Lova, F Barber, L Ingolotti, M Abril, MA Salido Metaheuristics for scheduling in industrial and manufacturing applications …, 2008 | 110 | 2008 |
A genetic approach to robust train timetabling MP Tormos, AL Lova, LP Ingolotti, F Barber Technical Report ARRIVAL-TR-0173, Arrival Project, 2008 | 10 | 2008 |
A Heuristic Technique for the Capacity M Abril, MA Salido, F Barber, L Ingolotti, A Lova, P Tormos | | |
A heuristic technique for the capacity assessment of periodic trains M Abril, MA Salido, F Barber, L Ingolotti, A Lova, P Tormos Artificial Intelligence Research and Development, 339-346, 2005 | 15 | 2005 |
A hybrid genetic algorithm for the multi-mode resource constrained project scheduling problem A Lova, P Tormos, M Cervantes, F Barber Proceedings of the Eleventh International Workshop on Project Management and …, 2008 | 3 | 2008 |
A multicriteria heuristic method to improve resource allocation in multiproject scheduling A Lova, C Maroto, P Tormos European journal of operational research 127 (2), 408-424, 2000 | 262 | 2000 |
A scheduling order-based method to solve timetabling problems L Ingolotti, F Barber, P Tormos, A Lova, MA Salido, M Abril Current Topics in Artificial Intelligence: 11th Conference of the Spanish …, 2006 | 8 | 2006 |
A Topological model based on railway capacity to manage periodic train scheduling MA Salido, F Barber, M Abril, P Tormos, A Lova, L Ingolotti International Conference on Innovative Techniques and Applications of …, 2004 | 6 | 2004 |
An assessment of railway capacity M Abril, F Barber, L Ingolotti, MA Salido, P Tormos, A Lova Transportation Research Part E: Logistics and Transportation Review 44 (5 …, 2008 | 649 | 2008 |
An efficient adaptative heuristic for the resource constrained project scheduling problem A Lova, P Tormos, M Cervantes, FB Sanchís XII Conferencia de la Asociación Española para la Inteligencia Artificial …, 2007 | 4 | 2007 |
An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes A Lova, P Tormos, M Cervantes, F Barber International Journal of Production Economics 117 (2), 302-316, 2009 | 241 | 2009 |
An efficient method to schedule new trains on a heavily loaded railway network L Ingolotti, F Barber, P Tormos, A Lova, MA Salido, M Abril Advances in Artificial Intelligence–IBERAMIA 2004: 9th Ibero-American …, 2004 | 34 | 2004 |
An efficient multi-pass heuristic for project scheduling with constrained resources P Tormos, A Lova International Journal of Production Research 41 (5), 1071-1086, 2003 | 119 | 2003 |
An integration model for planning and scheduling problems with constrained resources P Tormos, F Barber, A Lova 8th International Workshop on Project Management and Scheduling, 2002 | 5 | 2002 |
An interactive train scheduling tool for solving and plotting running maps F Barber, MA Salido, LP Ingolotti, M Abril, AL Lova, MP Tormos Current Topics in Artificial Intelligence: 10th Conference of the Spanish …, 2004 | 27 | 2004 |