A bidirectional heuristic for maximizing the net present value of large‐scale projects subject to limited resources T Selle, J Zimmermann Naval Research Logistics (NRL) 50 (2), 130-148, 2003 | 34 | 2003 |
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints K Watermeyer, J Zimmermann OR spectrum 42, 427-460, 2020 | 31 | 2020 |
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and time windows K Watermeyer, J Zimmermann M. Caramia, L. Bianco und S. Giordani (Hg.), Proceedings of the 16th …, 2018 | 2 | 2018 |
A Comparative Performance Analysis of Two MILP Formulations for the Resource-Renting-Problem M Reinke, J Zimmermann 2021 IEEE International Conference on Industrial Engineering and Engineering …, 2021 | 1 | 2021 |
A Comparison of two MILP formulations for the resource renting problem M Reinke, J Zimmermann Book of Extended Abstracts, 277, 0 | | |
A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints K Watermeyer, J Zimmermann Journal of Scheduling 26 (1), 95-111, 2023 | 3 | 2023 |
A generation scheme for the resource-constrained project scheduling problem with partially renewable resources and time windows M Karnebogen, J Zimmermann Book of Extended Abstracts of 17th International Conference on Project …, 2021 | 1 | 2021 |
A heuristic approach to project staffing M Walter, J Zimmermann Electronic Notes in Discrete Mathematics 36, 775-782, 2010 | 8 | 2010 |
A hybrid algorithm for vehicle routing of less-than-truckload carriers J Rieck, J Zimmermann Metaheuristics in the service industry, 155-171, 2009 | 12 | 2009 |
A Linearized Mixed-Integer Formulation for the Resource Levelling Problem T Gather, J Rieck, J Zimmermann Proceedings of the 12th International Workshop on Project Management and …, 2010 | | 2010 |
A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems A Franz, J Rieck, J Zimmermann OR spectrum 42 (1), 235-259, 2020 | 10 | 2020 |
A multi-round auction for staff to job assignment under myopic best response dynamics F Merz, C Schwindt, S Westphal, J Zimmermann 2020 IEEE International Conference on Industrial Engineering and Engineering …, 2020 | 2 | 2020 |
A Multi-Start Procedure for Underground Mine Scheduling J Rieck, M Schulze, J Zimmermann Proceedings of the 14th International Conference on Project Management and …, 2014 | | 2014 |
A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers C Seifi, M Schulze, J Zimmermann European Journal of Operational Research 292 (1), 27-42, 2021 | 22 | 2021 |
A new Mixed Integer Linear Model for a Rich Vehicle Routing Problem J Rieck, J Zimmermann Abstract CD of the Fourth International Workshop on Freight Transportation …, 2009 | | 2009 |
A new mixed integer linear model for a rich vehicle routing problem with docking constraints J Rieck, J Zimmermann Annals of Operations Research 181, 337-358, 2010 | 49 | 2010 |
A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints K Watermeyer, J Zimmermann OR spectrum 44 (2), 575-602, 2022 | 5 | 2022 |
A Project Scheduling Approach for Dismantling Nuclear Power Plants J Zimmermann, JH Bartels PMS 2008 Proceedings of the Eleventh International Workshop on Project …, 2008 | | 2008 |
A sampling procedure for real-life rich vehicle routing problems J Rieck, J Zimmermann Operations Research Proceedings 2006: Selected Papers of the Annual …, 2007 | 2 | 2007 |
A steepest ascent approach to maximizing the net present value of projects C Schwindt, J Zimmermann Mathematical Methods of Operations Research 53, 435-450, 2001 | 50 | 2001 |