Follow
Jürgen Zimmermann
Jürgen Zimmermann
Verified email at tu-clausthal.de
Title
Cited by
Year
A bidirectional heuristic for maximizing the net present value of large‐scale projects subject to limited resources
T Selle, J Zimmermann
Naval Research Logistics (NRL) 50 (2), 130-148, 2003
342003
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints
K Watermeyer, J Zimmermann
OR spectrum 42, 427-460, 2020
312020
A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and time windows
K Watermeyer, J Zimmermann
M. Caramia, L. Bianco und S. Giordani (Hg.), Proceedings of the 16th …, 2018
22018
A Comparative Performance Analysis of Two MILP Formulations for the Resource-Renting-Problem
M Reinke, J Zimmermann
2021 IEEE International Conference on Industrial Engineering and Engineering …, 2021
12021
A Comparison of two MILP formulations for the resource renting problem
M Reinke, J Zimmermann
Book of Extended Abstracts, 277, 0
A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
K Watermeyer, J Zimmermann
Journal of Scheduling 26 (1), 95-111, 2023
32023
A generation scheme for the resource-constrained project scheduling problem with partially renewable resources and time windows
M Karnebogen, J Zimmermann
Book of Extended Abstracts of 17th International Conference on Project …, 2021
12021
A heuristic approach to project staffing
M Walter, J Zimmermann
Electronic Notes in Discrete Mathematics 36, 775-782, 2010
82010
A hybrid algorithm for vehicle routing of less-than-truckload carriers
J Rieck, J Zimmermann
Metaheuristics in the service industry, 155-171, 2009
122009
A Linearized Mixed-Integer Formulation for the Resource Levelling Problem
T Gather, J Rieck, J Zimmermann
Proceedings of the 12th International Workshop on Project Management and …, 2010
2010
A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems
A Franz, J Rieck, J Zimmermann
OR spectrum 42 (1), 235-259, 2020
102020
A multi-round auction for staff to job assignment under myopic best response dynamics
F Merz, C Schwindt, S Westphal, J Zimmermann
2020 IEEE International Conference on Industrial Engineering and Engineering …, 2020
22020
A Multi-Start Procedure for Underground Mine Scheduling
J Rieck, M Schulze, J Zimmermann
Proceedings of the 14th International Conference on Project Management and …, 2014
2014
A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers
C Seifi, M Schulze, J Zimmermann
European Journal of Operational Research 292 (1), 27-42, 2021
222021
A new Mixed Integer Linear Model for a Rich Vehicle Routing Problem
J Rieck, J Zimmermann
Abstract CD of the Fourth International Workshop on Freight Transportation …, 2009
2009
A new mixed integer linear model for a rich vehicle routing problem with docking constraints
J Rieck, J Zimmermann
Annals of Operations Research 181, 337-358, 2010
492010
A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints
K Watermeyer, J Zimmermann
OR spectrum 44 (2), 575-602, 2022
52022
A Project Scheduling Approach for Dismantling Nuclear Power Plants
J Zimmermann, JH Bartels
PMS 2008 Proceedings of the Eleventh International Workshop on Project …, 2008
2008
A sampling procedure for real-life rich vehicle routing problems
J Rieck, J Zimmermann
Operations Research Proceedings 2006: Selected Papers of the Annual …, 2007
22007
A steepest ascent approach to maximizing the net present value of projects
C Schwindt, J Zimmermann
Mathematical Methods of Operations Research 53, 435-450, 2001
502001
The system can't perform the operation now. Try again later.
Articles 1–20