Follow
Chelliah Sriskandarajah
Chelliah Sriskandarajah
Hugh Roy Cullen Chair Professor
Verified email at mays.tamu.edu - Homepage
Title
Cited by
Year
A (10/7)-approximation algorithm for an optimum cyclic solution in additive travel-time robotic cells
HN Geismar, M Dawande, C Sriskandarajah
IIE Transactions 39 (2), 217-227, 2007
102007
A blocking flowshop scheduling problem with material handling constraint
TP Bagchi, S Naranpanawe, C Sriskandarajah
International Journal of Operations and Quantitative Management 9 (1), 1-20, 2003
32003
A Classification Scheme for Robotic Cells and Notation
MW Dawande, HN Geismar, SP Sethi, C Sriskandarajah
Throughput Optimization in Robotic Cells, 15-28, 2007
2007
A depository institution's optimal currency supply network under the Fed's new guidelines: Operating policies, logistics, and impact
M Mehrotra, M Dawande, C Sriskandarajah
Production and Operations Management 19 (6), 709-724, 2010
152010
A framework for analyzing influencer marketing in social networks: selection and scheduling of influencers
RR Mallipeddi, S Kumar, C Sriskandarajah, Y Zhu
Management Science 68 (1), 75-104, 2022
1422022
A Framework for Analyzing the US Coin Supply Chain
Y Huang, Y Zhu, S Kumar, B Shetty, C Sriskandarajah
Production and Operations Management 29 (12), 2736-2759, 2020
52020
A framework to analyze cash supply chains
D Rajamani, HN Geismar, C Sriskandarajah
Production and Operations Management 15 (4), 544-552, 2006
652006
A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups
JB Sidney, CN Potts, C Sriskandarajah
Operations Research Letters 26 (4), 165-173, 2000
342000
A heuristic for the two‐machine no‐wait openshop scheduling problem
JB Sidney, C Sriskandarajah
Naval Research Logistics (NRL) 46 (2), 129-145, 1999
211999
A Higher Level Heuristic for the Selection of Machines and Process Plans in Cellular Manufacturing
R Logendran, P Ramakrishna, C Sriskandarajah
SUMMER COMPUTER SIMULATION CONFERENCE, 1103-1103, 1992
1992
A loop material flow system design for automated guided vehicles
A Asef-Vaziri, M Dessouky, C Sriskandarajah
International Journal of Flexible Manufacturing Systems 13, 33-48, 2001
562001
A mathematical modelling approach for the process of part orientation in batch assembly automation
R Logendran, C Sriskandarajah
International Journal of Computer Integrated Manufacturing 10 (5), 335-344, 1997
11997
A note on productivity gains in flexible robotic cells
HN Geismar, SP Sethi, JB Sidney, C Sriskandarajah
International Journal of Flexible Manufacturing Systems 17 (1), 5-21, 2005
242005
A note on scheduling multiple parts in two-machine dual gripper robotic cell: Heuristic algorithm and performance guarantee
IG Drobouchevitch, S Sethi, J Sidney, C Sriskandarajah
International Journal of Operations and Quantitative Management 10 (4), 297-314, 2004
292004
A note on the complexity of openshop scheduling problems
W Kubiak, C Sriskandarajah, K Zaras
INFOR: Information Systems and Operational Research 29 (4), 284-294, 1991
671991
A note on the generalized due dates scheduling problems
C Sriskandarajah
Naval Research Logistics (NRL) 37 (4), 587-597, 1990
411990
A Review of Operational Issues in Managing Physical Currency Supply Chains
HN Geismar, C Sriskandarajah, Y Zhu
Production and Operations Management 26 (6), 976-996, 2017
232017
A review of recent theoretical development in scheduling dual-gripper robotic cells
C Sriskandarajah, B Shetty
International Journal of Production Research 56 (1-2), 817-847, 2018
212018
A review of TSP based approaches for flowshop scheduling
TP Bagchi, JND Gupta, C Sriskandarajah
European Journal of Operational Research 169 (3), 816-854, 2006
1222006
A Sales Forecast Model for Short‐Life‐Cycle Products: New Releases at Blockbuster
C Chung, SC Niu, C Sriskandarajah
Production and Operations Management 21 (5), 851-873, 2012
412012
The system can't perform the operation now. Try again later.
Articles 1–20