'School of Computer Science 2Electrotechnical Laboratory Carnegie Mellon University 1-1-4 Umezono, Tsukuba Pittsburgh, PA 15213 Ibaraki, 305 Japan H Kitano, SF Smith, T Higuchi Proceedings of the Fourth International Conference on Genetic Algorithms, 311, 1991 | | 1991 |
" Integrating Tradeoff Analysis D Nau, S Smith, V Trichur | | 1996 |
“Integrating Tradeoff Analysis and Plan-Based Evaluation of Designs D Nau, S Smith, V Trichur | 2 | 1996 |
12 Exploiting Schedules Local Flexibility during Execution of Pre-Computed SF Smith, N Keng, KG Kempf Artificial Intelligence Applications in Manufacturing, 277, 1992 | | 1992 |
12. PLAN OF CARE C Hedrick, MB Perdue, K Momtahan, J Berkman, J Selleck, SA Kearns, ... J Cardiovasc Nurs 19 (10), 13-20, 2004 | | 2004 |
14 Designing Collaborative EM Roth, EP DePass, R Scott, R Truxler, SF Smith, JL Wampler Cognitive Systems Engineering: The Future for a Changing World, 2017 | | 2017 |
4. Global Losses of Mangroves and Salt Marshes: Magnitudes, Causes, and Consequences I Valiela, E Kinney, J Culbertson, E Peacock, S Smith | | |
A blackboard architecture for integrated process planning/production scheduling TJ Laliberty, DW Hildum, NM Sadeh, J McA’Nulty, D Kjenstad, RVE Bryant, ... International Design Engineering Technical Conferences and Computers and …, 1996 | 16 | 1996 |
A case of acute hemolysis after ceftriaxone: immune complex mechanism demonstrated by flow cytometry R Kakaiya, J Cseri, S Smith, S Silberman, TC Rubinas, A Hoffstadter Archives of pathology & laboratory medicine 128 (8), 905-907, 2004 | 28 | 2004 |
A case of acute severe hemolysis after ceftriaxone: Immune complex mechanism demonstrated by flow cytometry RM Kakaiya, S Silberman, J Cseri, B Jochum, S Smith, T Rubinas, ... Transfusion 43 (9), 102A-102A, 2003 | 1 | 2003 |
A census of the Manx Shearwater Puffinus puffinus on Skomer, Skokholm and Middleholm, west Wales S Smith, G Thompson, CM Perrins Bird Study 48 (3), 330-340, 2001 | 21 | 2001 |
A Computationally Scalable Bayesian Sequential Learning Framework for Time-Series Forecasting V Parimi, I Kumar, SF Smith | | |
A Constraint Satisfaction Approach to Makespan Scheduling. CC Cheng, SF Smith AIPS, 45-52, 1996 | 36 | 1996 |
A Constraint-Based Approach to Solving Resource Constrained Project Scheduling Problems with Generalized Precedence Relations A Cesta, A Oddi, SF Smith | | |
A Constraint-Based Framework for Multi-Level Transportation Scheduling SF Smith, KP Sycara CMU Robotics Institute Technical Report, 1993 | 4 | 1993 |
A constraint-based framework for reactive management of factory schedules SF Smith Carnegie-Mellon University, 1987 | 99 | 1987 |
A constraint-based method for project scheduling with time windows A Cesta, A Oddi, SF Smith Journal of Heuristics 8, 109-136, 2002 | 337 | 2002 |
A constraint-posting framework for scheduling under complex constraints CC Cheng, SF Smith Proceedings 1995 INRIA/IEEE Symposium on Emerging Technologies and Factory …, 1995 | 32 | 1995 |
A cooperative scheduling system PS Ow, SF Smith, R Howie Expert Systems and Intelligent Manufacturing, 43-56, 1988 | 93 | 1988 |
A distributed layered architecture for mobile robot coordination: Application to space exploration D Goldberg, V Cicirello, MB Dias, R Simmons, S Smith, T Smith, A Stentz The 3rd International NASA Workshop on Planning and Scheduling for Space, 2002 | 47 | 2002 |