Robust and stable scheduling of a single machine with random machine breakdowns L Liu, H Gu, Y Xi The International Journal of Advanced Manufacturing Technology 31, 645-654, 2007 | 116 | 2007 |
Modified bottleneck-based heuristic for large-scale job-shop scheduling problems with a single bottleneck* Z Yan, G Hanyu, X Yugeng Journal of Systems Engineering and Electronics 18 (3), 556-565, 2007 | 39 | 2007 |
A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows D Thiruvady, M Wallace, H Gu, A Schutt Journal of heuristics 20, 643-676, 2014 | 25 | 2014 |
Terminal penalty rolling scheduling based on an initial schedule for single-machine scheduling problem B Wang, Y Xi, H Gu Computers & operations research 32 (11), 3059-3072, 2005 | 23 | 2005 |
A Lagrangian relaxation based forward-backward improvement heuristic for maximising the net present value of resource-constrained projects H Gu, A Schutt, PJ Stuckey Integration of AI and OR Techniques in Constraint Programming for …, 2013 | 22 | 2013 |
A rolling window optimization method for large-scale WCDMA base stations planning problem HY Zhang, YG Xi, HY Gu European journal of operational research 183 (1), 370-383, 2007 | 19 | 2007 |
Feasibility analysis and soft constraints adjustment of CMMO Y Xi, H Gu Acta Automatica Sinica 24, 727-732, 1998 | 19 | 1998 |
Exact and heuristic methods for the resource-constrained net present value problem H Gu, A Schutt, PJ Stuckey, MG Wallace, G Chu Handbook on project management and scheduling vol. 1, 299-318, 2015 | 15 | 2015 |
Rescheduling algorithm based on rolling horizon decomposition for a dynamic job shop with uncertain arriving time L Liu, H Gu, Y Xi Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2008 | 14 | 2008 |
Feasibility analysis and soft constraints adjustment of CMMO X Yugeng, G Hanyu Acta Automatica Sinica 24 (6), 726-731, 1998 | 14 | 1998 |
Efficient Lagrangian heuristics for the two-stage flow shop with job dependent buffer requirements H Gu, A Kononov, J Memar, Y Zinder Journal of Discrete Algorithms 52, 143-155, 2018 | 13 | 2018 |
A new algorithm for the computation of low frequency electro-mechanical oscillation modes of large power systems G Han-yu, C Chen PROCEEDINGS-CHINESE SOCIETY OF ELECTRICAL ENGINEERING 20 (9), 50-54, 2000 | 13 | 2000 |
ABFIA: A hybrid algorithm based on artificial bee colony and Fibonacci indicator algorithm A Etminaniesfahani, H Gu, A Salehipour Journal of Computational Science 61, 101651, 2022 | 12 | 2022 |
An efficient optimisation procedure for the workforce scheduling and routing problem: Lagrangian relaxation and iterated local search H Gu, Y Zhang, Y Zinder Computers & Operations Research 144, 105829, 2022 | 11 | 2022 |
Bottleneck-based decomposition algorithm for large-scale flow shop scheduling problems Y Zuo, H Gu, Y Xi Control and Decision 21 (4), 425, 2006 | 11 | 2006 |
Improving problem reduction for 0–1 multidimensional knapsack problems with valid inequalities H Gu Computers & Operations Research 71, 82-89, 2016 | 10 | 2016 |
Study on constraint scheduling algorithm for job shop problems with multiple constraint machines Y Zuo, H Gu, Y Xi International Journal of Production Research 46 (17), 4785-4801, 2008 | 10 | 2008 |
A decomposition and coordination scheduling method for flow-shop problem based on TOC HY Zhang, YG Xi, HY Gu Acta Automatica Sinica 31 (2), 182-187, 2005 | 10 | 2005 |
A multi-stage IP-based heuristic for class timetabling and trainer rostering O Czibula, H Gu, A Russell, Y Zinder Annals of Operations Research, 1-29, 2015 | 9 | 2015 |