Big data, industry 4.0 and cyber-physical systems integration: A smart industry context H Singh Materials Today: Proceedings 46, 157-162, 2021 | 68 | 2021 |
Materials and information flow analysis and optimization of manufacturing processes in MSMEs by the application of value stream mapping (VSM) technique H Singh, A Bahl, A Kumar, GS Mann Materials Today: Proceedings 5 (14), 28420-28426, 2018 | 21 | 2018 |
Multi-objective permutation and non-permutation flow shop scheduling problems with no-wait: a systematic literature review H Singh, JS Oberoi, D Singh RAIRO-Operations Research 55 (1), 27-50, 2021 | 19 | 2021 |
Supply Chain Wide Transformation of Traditional Industry to Industry 4.0 S Reddy, G. R. K., Singh, H. and Hariharan ARPN Journal of Engineering and Applied Sciences, 2016 | 17* | 2016 |
THE TAXONOMY OF DYNAMIC MULTI-OBJECTIVE OPTIMIZATION OF HEURISTICS ALGORITHMS IN FLOW SHOP SCHEDULING PROBLEMS: A SYSTEMATIC LITERATURE REVIEW. H Singh, JS Oberoi, D Singh International Journal of Industrial Engineering 27 (3), 2020 | 6 | 2020 |
Application of Time-Series Demand Forecasting Models with Seasonality and Trend Components for Industrial Products A Singh, H., Bahl, A, and Kumar International Journal of Mechanical Engineering and Technology, 2017 | 5* | 2017 |
Simulation and modelling of hybrid heuristics distribution algorithm for flow shop scheduling problem to optimize Makespan in an Indian manufacturing industry H Singh, JS Oberoi, D Singh NISCAIR-CSIR, India, 2021 | 2 | 2021 |
Modelling of heuristic distribution algorithm to optimize flexible production scheduling in Indian industry GR Reddy, H Singh, A Domeika, NM Kumar, M Quanjin Procedia Computer Science 167, 1120-1127, 2020 | 1 | 2020 |
Sequence-based transportation and optimization of a flow shop scheduling problem: A manufacturing industry context H Singh, JS Oberoi, D Singh AIP Conference Proceedings 2358 (1), 2021 | | 2021 |
Simulation and Optimization of Flexible Flow Shop Scheduling Problem in an Indian Manufacturing Industry H Singh, JS Oberoi, D Singh Advances in Intelligent Manufacturing: Select Proceedings of ICFMMP 2019 …, 2020 | | 2020 |
Application of A Novel Hybrid Meta-heuristics Algorithm to Simulate the Sequence-based Transportation Flow Shop Scheduling Problem: An Indian Manufacturing Industry Context H Singh, JS Oberoi, D Singh 19th Consortium of Students in Management Research (COSMAR), IISc. Bangalore, 2019 | | 2019 |
Optimizing a Multi-objective Flow Shop Scheduling Problem by Meta-heuristic Approach H Singh, JS Oberoi, D Singh International Journal for Research in Engineering Application & Management …, 2019 | | 2019 |
Decision-making Approaches and Heuristics Algorithms for Multi-objective Flow Shop Scheduling DS H Singh, JS Oberoi International Journal for Research in Engineering Application & Management …, 2019 | | 2019 |
Application of Multi-objective Flow Shop Scheduling for Indian Manufacturing Industry DS H Singh, JS Oberoi 18th Global Conference on “Digitalization and Flexibility for Organizational …, 2018 | | 2018 |
Multi-objective Optimization Algorithms for Flow Shop Scheduling Problems: A Literature Review H Kulbir, S. and Singh International Journal of Advance Research in Science and Engineering, 2018 | | 2018 |
Difficulties in Bi-Objective Optimization Algorithms and Hybrid Approaches for Flow Shop Scheduling Problems in Industry: A Perspective and Review H Kulbir, S. and Singh International Journal of Advance Research in Science and Engineering, 2018 | | 2018 |
Applications of Multi-Objective Optimization Algorithms for Scheduling: A Perspective and Review H Kulbir, S. and Singh International Journal of Advance Research in Science and Engineering, 2018 | | 2018 |
Review of Optimization Techniques for Finishing Machining of Steel: Model Formulation H Kapoor, A. and Singh 5th International Conference on Advancements in Engineering and Technology …, 2017 | | 2017 |
Review of Optimization of Cutting and Geometric Parameters for Finishing Machining of Steel: Prospects and Challenges H Kapoor, A. and Singh 5th International Conference on Advancements in Engineering and Technology …, 2017 | | 2017 |
Single and Multi-Objective Scheduling Problem to Heuristics Approach: A Model Formulation and Prospects DS Malhi, H Singh 5th International Conference on Advancements in Engineering and Technology …, 2017 | | 2017 |