Follow
Dwifitra Jumas
Dwifitra Jumas
Universitas Bung Hatta, Padang
Verified email at bunghatta.ac.id
Title
Cited by
Cited by
Year
Making decision toward overseas construction projects: An application based on adaptive neuro fuzzy system
WP Utama, APC Chan, H Zahoor, R Gao, DY Jumas
Engineering, construction and architectural management 26 (2), 285-302, 2019
322019
Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects
D Jumas, FA Mohd-Rahim, N Zainon, WP Utama
Built Environment Project and Asset Management 8 (4), 348-357, 2018
142018
Kajian potensi likuifaksi pasca gempa dalam rangka mitigasi bencana di Padang
H Warman, DY Jumas
Jurnal Rekayasa Sipil 9 (2), 1-19, 2013
132013
Standardisasi Pengukuran Kuantitas Pekerjaan Konstruksi di Indonesia: Suatu Gagasan
WP Utama, M Peli, DY Jumas
Prosiding PPIS Bandung 29, 2008
92008
ANFIS multi criteria decision making for overseas construction projects: a methodology
WP Utama, APC Chan, H Zahoor, R Gao, DY Jumas
IOP Conference Series: Earth and Environmental Science 117 (1), 012043, 2018
42018
Indikator penyebab praktik korupsi pada industri konstruksi di sumatera barat
DY Jumas, WP Utama, WW Wahyudi
Rekayasa Sipil 17 (1), 15-22, 2023
32023
Faktor Determinasi Komunikasi Efektif di Proyek Konstruksi dari Perspektif Multiple Stakeholders
M Peli, U W.P., D Jumas, Zulherman, Sesmiwati, V ariani, F Roza, ...
Jurnal Studi Komunikasi dan Media 26, 109-122, 2022
32022
Risk allocation of PPP waste to energy projects in Indonesia: A research framework
WP Utama, A Wibowo, DY Jumas, E Rita, M Peli
IOP Conference Series: Materials Science and Engineering 930 (1), 012023, 2020
32020
Penentuan Skala Prioritas Kegiatan Pemeliharaan Jalan Kabupaten di Kabupaten Pasaman Provinsi Sumatera Barat
A Rozaan, E Rita, DY Jumas
Structure 5 (1), 40-49, 2023
22023
Dampak Pandemi Covid 19 Terhadap Perusahaan Jasa Konsultan Konstruksi Di Sumatera Barat
DY Jumas, V Ariani, M Alius
CIVED 9 (2), 173-183, 2022
22022
Model Pengukuran Faktor Iklm Keselamatan (Safety Climate) Konstruksi (studi kasus proyek jalan di Sumatera Barat)
N Sikumbang, WP Utama, Sesmiwati, DY Jumas
Jurnal Teknik Sipil 28, 359-370, 2021
22021
Analisa kebutuhan standardisasi pengukuran kuantitas (standard method of measurement) pada industri konstruksi di indonesia
D Jumas, N Tela
Jurnal Rekayasa 7 (1), 16-26, 2017
12017
The Significance of Cost Variables and Their Influences on the Conceptual Cost Estimation Accuracy
D Jumas, FA Mohd-Rahim, N Zainon
12015
Improving Conceptual Cost Estimating Performance Pada Perhitungan Harga Satuan Tertinggi Bangunan Gedung di Sumatera Barat
N Nasril, DY Jumas
Jurnal Rekayasa Sipil 10 (1), 32-42, 2014
12014
Analisis Pengaruh Kompetensi Manajer Proyek terhadap Keberhasilan Proyek Kontruksi Transportasi Jalan Rel di Sumatera Bagian Barat
R Vianda, D Jumas, B Anif, M Peli, V Ariani
Jurnal Talenta Sipil 7 (2), 678-689, 2024
2024
The Implementation of Earned Value Management (EVM) to Control Project Performance in the Construction Industry in Sumatera Utara
M Athallasyah, D Jumas, W Utama, M Peli, Khadavi
International Journal of Scientific Engineering and Science 8 (7), 98-103, 2024
2024
MULTI-CRITERIA DECISION MODEL FOR MATERIAL SUPPLIER SELECTION FLEXIBLE PAVEMENT USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD
A Rizkian, DY Jumas, E Rita
Rang Teknik Journal 7 (2), 279-291, 2024
2024
Kelayakan Aksesibilitas Kaum Disabilitas di Bangunan Rumah Sakit MH. Thalib Kota Sungai Penuh
TM Dinata, N Carlo, DY Jumas
Arsitekta: Jurnal Arsitektur dan Kota Berkelanjutan 6 (01), 20-29, 2024
2024
Scoring Setting and Infrastructure di Kampus Politeknik Negeri Medan Berdasar UI GreenMetric
M Taufiq, N Carlo, DY Jumas, E Rita, L Utama
Structure 6 (1), 31-39, 2024
2024
Kajian Kelayakan dan Pengembangan TPS3R menggunakan GIS di Kota Sungai Penuh
YE Friyadi, N Carlo, DY Jumas
Prosiding TAU SNARS-TEK Seminar Nasional Rekayasa dan Teknologi 3 (1), 148-155, 2024
2024
The system can't perform the operation now. Try again later.
Articles 1–20