Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects MS Islama, MP Nepala, M Skitmorea, M Attarzadeh Advanced Engineering Informatics 33 (https://doi.org/10.1016/j.aei.2017.06 …, 2017 | 181 | 2017 |
Productivity improvement of precast shop drawings generation through BIM-based process re-engineering T Nath, M Attarzadeh, RLK Tiong, C Chidambaram, Z Yu Automation in Construction 54, 54-68, 2015 | 140 | 2015 |
Options-based negotiation management of PPP-BOT infrastructure projects Meghdad Attarzadeh, David K. H. Chua, Michael Beer, Ernest L. S. Abbott Construction Management and Economics, 2017 | 40 | 2017 |
Identifying key factors for building information modelling adoption in Singapore M Attarzadeh, T Nath, RLK Tiong Proceedings of the Institution of Civil Engineers-Management, Procurement …, 2015 | 37 | 2015 |
Fuzzy Randomness Simulation of Long-Term Infrastructure Projects M Attarzadeh, DKH Chua, M Beer, ELS Abbott ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A …, 2017 | 18 | 2017 |
Risk Management of Long Term Infrastructure Projects" PPP-BOT Projects" by Using Uncertainty, Probabilistic and Stochastic Methods, and Models M Attarzadeh, DKH Chua, M Beer Vulnerability, uncertainty, and risk: Analysis, modeling, and management …, 2011 | 11 | 2011 |
Precast workflow productivity measurement through BIM adoption T Nath, M Attarzadeh, RLK Tiong Proceedings of the Institution of Civil Engineers-Management, Procurement …, 2016 | 9 | 2016 |
Economic appraisal of BOT projects-financial risks management model M Attarzadeh MSc. Thesis, Amirkabir University of Technology, 2007 | 5 | 2007 |
Performance risk evaluation of long term infrastructure projects (PPP-BOT projects) using probabilistic methods M Attarzadeh, DKH Chua EPPM, Singapore, 20-21, 2011 | 4 | 2011 |
Negotiation-based risk management for PPP-BOT infrastructure projects M Attarzadeh Ph. D. thesis, National Univ. of Singapore, Singapore, 2014 | 2 | 2014 |
Life cycle financial modelling of long term infrastructure projects “PPP-BOT Projects” under uncertainty and risk M Attarzadeh, DKH Chua, L Zhu, M Beer Life-cycle and Sustainability of Civil Infrastructure Systems: Proceedings …, 2012 | 1 | 2012 |
Risk management of Asalouye desalination project M Attarzadeh, DKH Chua, M Beer Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management …, 2011 | 1 | 2011 |
Improving the Assessment of Noise Exposure and Warning Signal Audibility K Panthi, M Gharipour, M Attarzadeh | | 2023 |
Using Building Information Modeling for Job Hazard Analysis of Renovating Residential Buildings K Panthi, M Gharipour, M Attarzadeh | | 2023 |
What Medical Screenings Indicate about Changes in Construction Worker Health K Panthi, M Gharipour, M Attarzadeh | | 2023 |
Using BIM in Residential Renovation K Panthi, M Gharipour, M Attarzadeh | | 2023 |
BIM handbook: a guide to building information modeling for owners, designers, engineers, contractors, and facility managers RT Meghdad Attarzadeh, T. Nath, A. Lee BIM Handbook, ISBN-13: 978-1119287537 ISBN-10: 9781119287537, Wiley, 2018 | | 2018 |
BIM Handbook Book Chapter: Building Information Modelling (BIM) for high-rise Prefinished Prefabricated Volumetric Construction (PPVC) in Singapore, Cast study- NTU Student … M Attarzadeh, T Nath, A Lee, R Tiong BIM Handbook, ISBN-13: 978-1119287537 ISBN-10: 9781119287537, Wiley 3, 499-522, 2018 | | 2018 |