Disassembly planning and scheduling: review and further research DH Lee, JG Kang, P Xirouchakis Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2001 | 192 | 2001 |
Heterogeneous fixed fleet vehicle routing considering carbon emission YJ Kwon, YJ Choi, DH Lee Transportation Research Part D: Transport and Environment 23, 81-89, 2013 | 184 | 2013 |
Disassembly scheduling: literature review and future research directions HJ Kim, DH Lee, P Xirouchakis International Journal of Production Research 45 (18-19), 4465-4484, 2007 | 145 | 2007 |
A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities K Yeong-Dae, L Dong-Ho, K Jung-Ug, R Hwan-Kyun Journal of Manufacturing Systems 17 (2), 107-117, 1998 | 127 | 1998 |
Real-time scheduling for reentrant hybrid flow shops: A decision tree based mechanism and its application to a TFT-LCD line HS Choi, JS Kim, DH Lee Expert systems with Applications 38 (4), 3514-3521, 2011 | 124 | 2011 |
Parallel disassembly sequencing with sequence-dependent operation times JG Kang, DH Lee, P Xirouchakis, JG Persson CIRP Annals 50 (1), 343-346, 2001 | 124 | 2001 |
Disassembly process planning algorithms for end-of-life product recovery and environmentally conscious disposal YS Ma, HB Jun, HW Kim, DH Lee International journal of production research 49 (23), 7007-7027, 2011 | 108 | 2011 |
Disassembly scheduling with capacity constraints DH Lee, P Xirouchakis, R Zust CIRP Annals 51 (1), 387-390, 2002 | 105 | 2002 |
Disassembly scheduling with multiple product types HJ Kim, DH Lee, P Xirouchakis, R Züst CIRP Annals 52 (1), 403-406, 2003 | 98 | 2003 |
A tabu search algorithm for unrelated parallel machine scheduling with sequence-and machine-dependent setups: minimizing total tardiness JH Lee, JM Yu, DH Lee The International Journal of Advanced Manufacturing Technology 69, 2081-2089, 2013 | 97 | 2013 |
A two-stage heuristic for disassembly scheduling with assembly product structure DH Lee, P Xirouchakis Journal of the Operational Research Society 55 (3), 287-297, 2004 | 91 | 2004 |
Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality HJ Kim, DH Lee, P Xirouchakis International Journal of Production Research 44 (1), 195-212, 2006 | 87 | 2006 |
A branch and bound algorithm for disassembly scheduling with assembly product structure HJ Kim, DH Lee, P Xirouchakis, OK Kwon Journal of the Operational Research Society 60 (3), 419-430, 2009 | 74 | 2009 |
Disassembly scheduling: integer programming models DH Lee, HJ Kim, G Choi, P Xirouchakis Proceedings of the Institution of Mechanical Engineers, Part B: Journal of …, 2004 | 72 | 2004 |
A priority scheduling approach for flexible job shops with multiple process plans HH Doh, JM Yu, JS Kim, DH Lee, SH Nam International Journal of Production Research 51 (12), 3748-3764, 2013 | 67 | 2013 |
Scheduling algorithms to minimize the number of tardy jobs in two-stage hybrid flow shops HS Choi, DH Lee Computers & Industrial Engineering 56 (1), 113-120, 2009 | 63 | 2009 |
A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints HJ Kim, DH Lee, P Xirouchakis Journal of the Operational Research Society 57 (10), 1231-1240, 2006 | 61 | 2006 |
Search heuristics for operation sequencing in process planning DH Lee, D Kiritsis, P Xirouchakis International journal of production research 39 (16), 3771-3788, 2001 | 61 | 2001 |
Scheduling algorithms for two-stage reentrant hybrid flow shops: minimizing makespan under the maximum allowable due dates HS Choi, HW Kim, DH Lee, J Yoon, CY Yun, KB Chae The International Journal of Advanced Manufacturing Technology 42, 963-973, 2009 | 60 | 2009 |
Disassembly scheduling with parts commonality using petri nets with timestamps KP Neuendorf, DH Lee, D Kiritsis, P Xirouchakis Fundamenta Informaticae 47 (3-4), 295-306, 2001 | 57 | 2001 |