Combination of project cost forecasts in earned value management
BC Kim, KF Reinschmidt
Journal of Construction Engineering and Management 137 (11), 958-966, 2011
1332011
Probabilistic forecasting of project duration using Kalman filter and the earned value method
BC Kim, KF Reinschmidt
Journal of Construction Engineering and Management 136 (8), 834-843, 2010
1152010
Forecasting project progress and early warning of project overruns with probabilistic methods
BC Kim
Texas A&M University, 2007
582007
Sensitivity of earned value schedule forecasting to S-curve patterns
BC Kim, HJ Kim
Journal of Construction Engineering and Management 140 (7), 04014023, 2014
502014
Integrating risk assessment and actual performance for probabilistic project cost forecasting: A second moment Bayesian model
BC Kim
IEEE Transactions on Engineering Management 62 (2), 158 - 170, 2015
432015
Probabilistic evaluation of cost performance stability in earned value management
BC Kim
Journal of Management in Engineering 32 (1), 04015025, 2016
422016
Dynamic control thresholds for consistent earned value analysis and reliable early warning
BC Kim
Journal of Management in Engineering 31 (5), 2015
322015
Cost performance as a stochastic process: EAC projection by Markov Chain simulation
J Du, BC Kim, D Zhao
Journal of Construction Engineering and Management 142 (6), 04016009, 2016
312016
What CPI = 0.85 Really Means: A Probabilistic Extension of the Estimate at Completion
BC Kim, JK Pinto
Journal of Management in Engineering 35 (2), 2019
282019
Improving the accuracy and operational predictability of project cost forecasts: an adaptive combination approach
BC Kim, YH Kwak
Production Planning & Control 29 (9), 743-760, 2018
192018
Probability distribution of the project payback period using the equivalent cash flow decomposition
BC Kim, E Shim, KF Reinschmidt
The Engineering Economist 58 (2), 112-136, 2013
182013
A second moment approach to probabilistic IRR using Taylor series
BC Kim, KF Reinschmidt
The Engineering Economist 57 (1), 1-19, 2012
152012
Dependence Modeling for Large-scale Project Cost and Time Risk Assessment: Additive Risk Factor Approaches
BC Kim
IEEE Transactions on Engineering Management 70 (2), 417-436, 2023
132023
Credibility evaluation of project duration forecast using forecast sensitivity and forecast-risk compatibility
BC Kim, SJ Kim
Journal of Construction Engineering and Management 141 (8), 2015
122015
An S-curve Bayesian model for forecasting probabilistic distributions on project duration and cost at completion
BC Kim, K Reinschmidt
CME 25 Conference Construction Management and Economics, 1449, 2007
112007
Probabilistic performance risk evaluation of infrastructure projects
BC Kim
Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management …, 2011
92011
Multi-factor dependence modelling with specified marginals and structured association in large-scale project risk assessment
BC Kim
European Journal of Operational Research 296 (2), 679-695, 2022
62022
Batch-size based repetitive scheduling method (BRSM)
E Shim, BC Kim
International Journal of Construction Education and Research 10 (2), 140-156, 2014
52014
Multi-factor association dependence modelling for project risk analysis
BC Kim
MethodsX 8, 101443, 2021
12021
Cash-flow simulation game for teaching project cash-flow forecasting
E Shim, BC Kim, S Kim
Technology Interface International Journal 13 (2), 12-19, 2013
2013