Machine Learning Algorithms for Construction Projects Delay Risk Prediction A Gondia, A Siam, W El-Dakhakhni, AH Nassar Journal of Construction Engineering and Management, ASCE 146 (1), 2020 | 249 | 2020 |
The effect of building information modeling (BIM) on construction claims A El Hawary, A Nassar Int. J. Sci. Technol. Res 5 (12), 25-33, 2015 | 29 | 2015 |
The Effect of Risk Allocation on Minimizing Disputes in Construction Projects in Egypt R yasser, AH Nassar German University in Cairo (GUC), Faculty of Engineering, 2016 | 11 | 2016 |
Investigating the impact of changing the usage type of existing structure using BIM HM Mahmoud, AA Fayad, AH Nassar Civ. Eng. J 8 (8), 1606-1621, 2022 | 9 | 2022 |
Using multi-criteria decision making (MCDM) methods in Egyptian construction projects R Ahmed, M Afifi, A Nassar Canadian Society for Civil Engineering Annual Conference, 2019 | 6 | 2019 |
Delay Analysis Statements in Presence of Debatable Concerns in Construction Projects A Wasfy, AH Nassar IEEE Engineering Management Review 49 (4), 123-135, 2021 | 4 | 2021 |
Causes and Effects of Delay in the Construction Industry in Egypt AH Nassar International Journal of Engineering Research & Technology (IJERT), 2016 | 4 | 2016 |
Delay analysis methods and statements in construction projects AHN Abanoub Wasfy International Journal of Project Organisation and Management 14 (4), 431 - 451, 2022 | 3 | 2022 |
CLAIMS AND DISPUTES RESOLUTION USING BIM TECHNOLOGY AND VDC PROCESS IN CONSTRUCTION CONTRACT RISK ANALYSIS AMA Abd-Ellatif, AH Nassar International Journal of Civil Engineering and Technology 12 (4), 82-107, 2021 | 3 | 2021 |
Using Support Vector Machine (SVM) for Time and Cost Overrun Analysis in Construction Projects in Egypt AHN Mohamed Gamal Eltoukhy International Journal of Civil Engineering and Technology (IJCIET) 12 (3), 5-22, 2021 | 3* | 2021 |
Using Artificial Neural Networks to Model Cost Overruns in Real Estate Projects AHN Kareem Mohammad Mahmoud Mostafa International Journal of Research and Scientific Innovation (IJRSI) 5 (X), 72-86, 2018 | 3* | 2018 |
Cost Analysis for Irrigation Projects Using Solar Energy in Egypt AW Soliman, AH Nassar, AM Sattar | 3 | 2018 |
Introduction to Project Management Using Critical Path Method (CPM) AH Nassar | 3 | 2018 |
Comparing suitability of NEC and FIDIC contracts in managing construction project in Egypt AH Nassar, ND Rasslan International Journal of Engineering Research & Technology (IJERT) 6 (6 …, 2017 | 3 | 2017 |
Improving Project Management At the Design Phase By Applying Lean Six Sigma as a Troubleshooting System T Sakr, AH Nassar IEEE Engineering Management Review, 1-14, 2022 | 2 | 2022 |
Integrated Model for Selecting the Best-Value Contractor in Construction Projects in Egypt MS Shehata, AH Nassar International Journal of Research in Engineering and Technology 7 (01), 2018 | 2 | 2018 |
Legal barriers and associated solutions of BIM implementation in the Egyptian AEC industry MA Abdelwahab, AH Nassar International Journal of Construction Management 24 (13), 1431-1443, 2024 | 1 | 2024 |
ENGINEERING & MANAGEMENT TCE Cheng, PWC Choy, SW Wong, M Wolf, A Ketenci, A Weyand, ... China Communications 1, 2021 | 1 | 2021 |
RISK ALLOCATION FRAMEWORK TO MINIMIZE DISPUTES IN CONSTRUCTION PROJECTS: CASE STUDY OF EGYPT R Ahmed, A Nassar | 1 | 2018 |
Evaluation of Factors Leading to Time Delays and Cost Overruns in Marine Construction Projects AME Ayman H. Nassar Engineering, Technology & Applied Science Research 14 (5), 16095-16102, 2024 | | 2024 |