The minizinc challenge 2008–2013
PJ Stuckey, T Feydy, A Schutt, G Tack, J Fischer
AI Magazine 35 (2), 55-60, 2014
1432014
Explaining the cumulative propagator
A Schutt, T Feydy, PJ Stuckey, MG Wallace
Constraints 16, 250-282, 2011
1242011
Solving RCPSP/max by lazy clause generation
A Schutt, T Feydy, PJ Stuckey, MG Wallace
Journal of scheduling 16, 273-289, 2013
1162013
Why cumulative decomposition is not as bad as it sounds
A Schutt, T Feydy, PJ Stuckey, MG Wallace
Principles and Practice of Constraint Programming-CP 2009: 15th …, 2009
842009
Explaining time-table-edge-finding propagation for the cumulative resource constraint
A Schutt, T Feydy, PJ Stuckey
Integration of AI and OR Techniques in Constraint Programming for …, 2013
632013
Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems
S Kreter, A Schutt, PJ Stuckey, J Zimmermann
European Journal of Operational Research 266 (2), 472-486, 2018
362018
Maximising the net present value for resource-constrained project scheduling
A Schutt, G Chu, PJ Stuckey, MG Wallace
International Conference on Integration of Artificial Intelligence (AI) and …, 2012
362012
A New O(n^2 log n) Not-First/Not-Last Pruning Algorithm for Cumulative Resource Constraints
A Schutt, A Wolf
Principles and Practice of Constraint Programming - CP 2010, 445-459, 2010
35*2010
Using constraint programming for solving RCPSP/max-cal
S Kreter, A Schutt, PJ Stuckey
Constraints 22, 432-462, 2017
342017
Chuffed, a lazy clause generation solver
G Chu, PJ Stuckey, A Schutt, T Ehlers, G Gange, K Francis
URL: https://github. com/chuffed/chuffed, 2018
332018
Incremental Satisfiability and Implication for UTVPI Constraints
A Schutt, PJ Stuckey
INFORMS Journal on Computing 22 (4), 514-527, 2010
302010
Not-First and Not-Last Detection for Cumulative Scheduling in O (n^3 log n)
A Schutt, A Wolf, G Schrader
Declarative Programming for Knowledge Management, 66-80, 2006
28*2006
A lagrangian relaxation and ACO hybrid for resource constrained project scheduling with discounted cash flows
D Thiruvady, M Wallace, H Gu, A Schutt
Journal of heuristics 20, 643-676, 2014
252014
Global difference constraint propagation for finite domain solvers
T Feydy, A Schutt, PJ Stuckey
Proceedings of the 10th international ACM SIGPLAN conference on Principles …, 2008
252008
Constraint programming applied to the multi-skill project scheduling problem
KD Young, T Feydy, A Schutt
Principles and Practice of Constraint Programming: 23rd International …, 2017
242017
Modelling and solving multi-mode resource-constrained project scheduling
R Szeredi, A Schutt
Principles and Practice of Constraint Programming: 22nd International …, 2016
222016
A Lagrangian relaxation based forward-backward improvement heuristic for maximising the net present value of resource-constrained projects
H Gu, A Schutt, PJ Stuckey
Integration of AI and OR Techniques in Constraint Programming for …, 2013
222013
Optimal carpet cutting
A Schutt, PJ Stuckey, AR Verden
International Conference on Principles and Practice of Constraint …, 2011
212011
Modelling with option types in MiniZinc
C Mears, A Schutt, PJ Stuckey, G Tack, K Marriott, M Wallace
Integration of AI and OR Techniques in Constraint Programming: 11th …, 2014
182014
Scheduling optional tasks with explanation
A Schutt, T Feydy, PJ Stuckey
International Conference on Principles and Practice of Constraint …, 2013
182013