Early contractor involvement in design and its impact on construction schedule performance L Song, Y Mohamed, SM AbouRizk Journal of management in engineering 25 (1), 12-20, 2009 | 315 | 2009 |
Toward an understanding of the impact of production pressure on safety performance in construction operations SU Han, F Saba, SH Lee, Y Mohamed, F Peña-Mora Accident analysis & prevention 68, 106-116, 2014 | 205 | 2014 |
Research in modeling and simulation for improving construction engineering operations S AbouRizk, D Halpin, Y Mohamed, U Hermann Journal of Construction Engineering and Management 137 (10), 843-852, 2011 | 203 | 2011 |
Role for Fe (III) minerals in nitrate-dependent microbial U (IV) oxidation JM Senko, Y Mohamed, TA Dewers, LR Krumholz Environmental Science & Technology 39 (8), 2529-2536, 2005 | 152 | 2005 |
Simphony-an integrated environment for construction simulation S AbouRizk, Y Mohamed 2000 Winter Simulation Conference Proceedings (Cat. No. 00CH37165) 2, 1907-1914, 2000 | 142 | 2000 |
Visual outcomes and prognostic factors in open-globe injuries A Fujikawa, YH Mohamed, H Kinoshita, M Matsumoto, M Uematsu, ... BMC ophthalmology 18, 1-8, 2018 | 136 | 2018 |
Simulation-based multiagent approach for scheduling modular construction H Taghaddos, U Hermann, S AbouRizk, Y Mohamed Journal of Computing in Civil Engineering 28 (2), 263-274, 2014 | 121 | 2014 |
Bayesian updating application into simulation in the North Edmonton Sanitary Trunk tunnel project TH Chung, Y Mohamed, S AbouRizk Journal of Construction Engineering and Management 132 (8), 882-894, 2006 | 104 | 2006 |
Flow production of pipe spool fabrication: Simulation to support implementation of lean technique P Wang, Y Mohamed, SM Abourizk, ART Rawa Journal of Construction Engineering and Management 135 (10), 1027-1038, 2009 | 77 | 2009 |
Framework for building intelligent simulation models of construction operations Y Mohamed, SM AbouRizk Journal of computing in civil engineering 19 (3), 277-291, 2005 | 69 | 2005 |
Modeling weather-sensitive construction activity using simulation A Shahin, SM AbouRizk, Y Mohamed Journal of construction engineering and management 137 (3), 238-246, 2011 | 62 | 2011 |
Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain Y Ebrahimy, SM AbouRizk, S Fernando, Y Mohamed Engineering, Construction and Architectural Management 18 (5), 462-480, 2011 | 60 | 2011 |
Two-way integration of 3D visualization and discrete event simulation for modeling mobile crane movement under dynamically changing site layout A ElNimr, M Fagiar, Y Mohamed Automation in construction 68, 235-248, 2016 | 59 | 2016 |
Melatonin maximizes the therapeutic potential of non-preconditioned MSCs in a DEN-induced rat model of HCC MA El-Magd, Y Mohamed, ES El-Shetry, SA Elsayed, MA Gazia, ... Biomedicine & Pharmacotherapy 114, 108732, 2019 | 55 | 2019 |
Simulation‐based scheduling of module assembly yards: case study Y Mohamed, D Borrego, L Francisco, M Al‐Hussein, S AbouRizk, ... Engineering, Construction and Architectural Management 14 (3), 293-311, 2007 | 55 | 2007 |
Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews A Agbulos, Y Mohamed, M Al-Hussein, S AbouRizk, J Roesch Journal of Construction Engineering and Management 132 (3), 291-299, 2006 | 53 | 2006 |
Role of apoptosis in eyelid development YH Mohamed, H Gong, T Amemiya Experimental eye research 76 (1), 115-123, 2003 | 47 | 2003 |
Success rates of vitrectomy in treatment of rhegmatogenous retinal detachment YH Mohamed, K Ono, H Kinoshita, M Uematsu, E Tsuiki, A Fujikawa, ... Journal of ophthalmology 2016 (1), 2193518, 2016 | 45 | 2016 |
Simulation-based auction protocol for resource scheduling problems H Taghaddos, S AbouRizk, Y Mohamed, U Hermann Journal of construction engineering and management 138 (1), 31-42, 2012 | 44 | 2012 |
Comparative study of data mining models for prediction of bridge future conditions P Martinez, E Mohamed, O Mohsen, Y Mohamed Journal of Performance of Constructed Facilities 34 (1), 04019108, 2020 | 43 | 2020 |