Follow
Alcides R Santander-Mercado
Alcides R Santander-Mercado
Verified email at uninorte.edu.co
Title
Cited by
Cited by
Year
Modelling building emergency evacuation plans considering the dynamic behaviour of pedestrians using agent-based simulation
KR Rozo, J Arellana, A Santander-Mercado, M Jubiz-Diaz
Safety science 113, 276-284, 2019
1312019
Measuring reliability of hybrid photovoltaic-wind energy systems: A new indicator
LG Acuna, RV Padilla, AS Mercado
Renewable Energy 106, 68-77, 2017
1232017
Tis-bad: a time series-based deobfuscation algorithm
M Labrador, P Wightman, A Santander, D Jabba, M Jimeno
Investigación e Innovación en Ingenierías 3 (1), 2015
272015
The economic lot scheduling problem: a survey
A Santander-Mercado, M Jubiz-Diaz
International Journal of Production Research 54 (16), 4973-4992, 2016
262016
A multi-item multi-packaging model to minimise cost of lost units, unpacking cost and CO2 emissions
M Jubiz-Diaz, A Santander-Mercado, JE Candelo-Becerra
International Journal of Production Research 57 (20), 6246-6263, 2019
182019
High variability geographical obfuscation for location privacy
P Wightman, M Zurbaran, A Santander
2013 47th International Carnahan conference on security technology (ICCST), 1-6, 2013
142013
Soft-computing approaches for rescheduling problems in a manufacturing industry
J Acevedo-Chedid, J Grice-Reyes, H Ospina-Mateus, K Salas-Navarro, ...
RAIRO-Operations Research 55, S2125-S2159, 2021
122021
Comparison of multiobjective harmony search, cuckoo search and bat-inspired algorithms for renewable distributed generation placement
JE Candelo-Becerra, HE Hernández-Riaño, AR Santander-Mercado
TecnoLógicas 18 (35), 105-116, 2015
72015
Uso de electricidad de las comunidades indígenas según el umbral de subsistencia en la Guajira, Colombia
E Ojeda, JE Candelo, A Santander
Revista Espacios 38 (57), 31, 2017
62017
Location and size of renewable energy sources and capacitors in radial distribution systems with commercial losses/Localización y dimensionamiento de energías renovables y …
JEC Becerra, HEH Riaño, ARS Mercado
Ingeniare: Revista Chilena de Ingenieria 24 (4), 600, 2016
62016
Thalamic reticular cells firing modes and its dependency on the frequency and amplitude ranges of the current stimulus
O Hernandez, L Hernandez, D Vera, A Santander, E Zurek
Medical & Biological Engineering & Computing 53, 37-44, 2015
52015
A hybrid bat-inspired algorithm with harmony search to locate distributed generation
JE CANDELO, HE HERNANDEZ, AR SANTANDER
Revista Espacios 38 (57), 2017
42017
Reprogramación de producción en cadenas de suministro colaborativas: Una revisión de la literatura
J Acevedo Chedid, KP Salas Navarro, H Ospina Mateus, ...
Espacios, 2017
42017
Lexicographic multi-objective optimisation of hybrid power generation systems for communities in non-interconnected zones
EO Camargo, JE Candelo-Becerra, AS Mercado
International Journal of Energy Economics and Policy 9 (3), 205-217, 2019
32019
Establishing call-centre staffing levels using aggregate planning and simulation approach
R Barbosa-Correa, A Santander-Mercado, M Jubiz-Diaz, ...
European Journal of Industrial Engineering 14 (1), 1-33, 2020
22020
Indices and grades of regional flood risk in a flood alert system: use of fuzzy logic.
A Santander, X Vargas
22006
An optimisation model to locate level crossings in railway lines at mines to minimise the total weighted-walked distance
A Santander-Mercado, R Amaya-Mier, L Castaño-Campo, M Jubiz-Diaz
IATSS research 48 (1), 40-54, 2024
12024
Development methodology to share vehicles optimizing the variability of the mileage
LE Ramírez Polo, AR Santander-Mercado, MA Jimenez-Barros
International Conference on Computer Information Systems and Industrial …, 2020
12020
Measuring reliability of hybrid photovoltaic-wind energy systems: A new indicator
LGà Acuña, AS Mercado, RV Padilla
Renewable energy, 2017
12017
Localización y dimensionamiento de energías renovables y capacitores en sistemas de distribución radiales con pérdidas comerciales
JE Cándelo Becerra, HE Hernández Riaño, AR Santander Mercado
Ingeniare. Revista chilena de ingeniería 24 (4), 600-614, 2016
12016
The system can't perform the operation now. Try again later.
Articles 1–20