Follow
Z.T. Li
Z.T. Li
Guangdong University of Technology, Guangzhou, China
No verified email - Homepage
Title
Cited by
Cited by
Year
Unrelated parallel machine scheduling problem with energy and tardiness cost
Z Li, H Yang, S Zhang, G Liu
The International Journal of Advanced Manufacturing Technology 84, 213-226, 2016
692016
Proactive approach for stochastic RCMPSP based on multi-priority rule combinations
X Wang, Q Chen, N Mao, X Chen, Z Li
International Journal of Production Research 53 (4), 1098-1110, 2015
392015
Meta-heuristics for unrelated parallel machines scheduling with random rework to minimize expected total weighted tardiness
X Wang, Z Li, Q Chen, N Mao
Computers & Industrial Engineering 145, 106505, 2020
262020
Performance analysis of open general queuing networks with blocking and feedback
HY Zhang, QX Chen, JMG Smith, N Mao, AL Yu, ZT Li
International Journal of Production Research 55 (19), 5760-5781, 2017
262017
Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint
黎展滔*(Zhantao Li), 陈庆新(Q. X. Chen), 毛宁(Ning Mao)王小明(Xiaoming Wang ...
International Journal of Production Economics 146 (2), 667-678, 2013
202013
Controlling delivery and energy performance of parallel batch processors in dynamic mould manufacturing
JJ Liu, ZT Li, QX Chen, N Mao
Computers & Operations Research 66, 116-129, 2016
112016
Approximation algorithms for the three-stage flexible flow shop problem with mid group constraint
Z Li, J Liu, Q Chen, N Mao, X Wang
Expert Systems with Applications 42 (7), 3571–3584, 2015
112015
A heuristic algorithm for two-stage flexible flow shop scheduling with head group constraint
黎展滔*(Zhantao Li),陈庆新(Q. X. Chen)毛宁(Ning Mao)
International Journal of Production Research 51 (3), 751-771, 2013
112013
具有前成组约束的两阶段柔性流水车间的启发式算法研究
黎展滔*,陈庆新毛宁
机械工程学报 48 (22), 189-198, 2012
42012
具有后成组约束的两阶段柔性流水作业计划制订的启发式算法
黎展滔*,陈庆新毛宁
机械工程学报 49 (7), 148-157, 2013
32013
Parallel machine batch scheduling for due date constraints and setup time
D Ma, QX Chen, N Mao, ZZ Wang, ZT Li
Computer Integrated Manufacturing System 18 (01), 0, 2012
32012
Branch and bound method with heuristic algorithm for a special flexible flow shop scheduling problem
ZT Li, F Hong, QX Chen, N Mao
Advanced Materials Research 139, 1530-1534, 2010
32010
The system can't perform the operation now. Try again later.
Articles 1–12