Подписаться
Andrew Nash
Andrew Nash
University of Applied Sciences, St Poelten Austria
Подтвержден адрес электронной почты в домене andynash.com - Главная страница
Название
Процитировано
Процитировано
Год
Railroad simulation using OpenTrack
A Nash, D Huerlimann
WIT Transactions on The Built Environment 74, 2004
3312004
Passenger arrival rates at public transport stations
M Luethi, U Weidmann, A Nash
TRB 86th Annual Meeting Compendium of Papers, 07-0635, 2007
1562007
RailML a standard data interface for railroad applications
A Nash, D Huerlimann, J Schütte, VP Krauss
WIT Transactions on The Built Environment 74, 2004
1022004
Development of a dwell time calculation model for timetable planning
S Buchmüller, U Weidmann, A Nash
WIT Transactions on The Built Environment 103, 525-534, 2008
762008
Implementation of Zurich’s Transit Priority Program
AB Nash, R Sylvia
Mineta Transportation Institute, San Jose State University, 2001
47*2001
Checklist for successful application of tram–train systems in Europe
L Naegeli, U Weidmann, A Nash
Transportation Research Record 2275 (1), 39-48, 2012
462012
Web 2.0 applications for improving public participation in transport planning
A Nash
Transportation Research Board 89th Annual Meeting, 2009
452009
Best practices in shared-use high-speed rail systems
A Nash
Mineta Transportation Institute, San Jose State University; Report 02-02 …, 2003
45*2003
Effects of onboard ticket sales on public transport reliability
R Dorbritz, M Lüthi, U Weidmann, A Nash
Transportation Research Record 2110 (1), 112-119, 2009
442009
Implementing Zurich’s transit priority program
A Nash
Transportation Research Record 1835 (1), 59-65, 2003
422003
Increasing railway capacity and reliability through integrated real-time rescheduling
M Luethi, A Nash, U Weidmann, F Laube, R Wuest
Proceedings of the 11th World Conference on Transport Research, 2007
402007
Structure and simulation evaluation of an integrated real-time rescheduling system for railway networks
M Luethi, G Medeossi, A Nash
Networks and Spatial Economics 9, 103-121, 2009
322009
Evaluation of an integrated real-time rescheduling and train control system for heavily used areas
M Lüthi, G Medeossi, A Nash
International Seminar on Railway Operations Modelling and Analysis (IAROR …, 2007
282007
OPENTRACK-Simulation of railway networks, user manual version 1.3
D Huerlimann, AB Nash
ETH Zurich: Institute for Transportation Planning and Systems, 2003
282003
Applying low-cost airline pricing strategies to European railroads
T Sauter-Servaes, A Nash
Transportation Research Record 1995 (1), 1-8, 2007
252007
OpenTrack: simulation of railway networks: Version 1.3
D Hürlimann, AB Nash
ETH Zurich, Institute for Transport Planning and Systems, 2003
222003
Tram safety in mixed traffic: Best practices from Switzerland
CM Marti, J Kupferschmid, M Schwertner, A Nash, U Weidmann
Transportation Research Record 2540 (1), 125-137, 2016
212016
Light rail transit experience in Madrid, Spain: effects on population settlement and land use
FJ Calvo, J de Oña, F Arán, A Nash
Transportation research record 2353 (1), 82-91, 2013
202013
OpenTrack—simulation of railway networks
D Hürlimann, AB Nash
OpenTrack Railway Technology Ltd., Zurich, 2012
202012
Increasing schedule reliability on the S-Bahn in Zurich, Switzerland: Computer analysis and simulation
A Nash, U Weidmann, S Bollinger, M Luethi, S Buchmueller
Transportation research record 1955 (1), 17-25, 2006
202006
В данный момент система не может выполнить эту операцию. Повторите попытку позднее.
Статьи 1–20