关注
Camilla Follini
Camilla Follini
未知所在单位机构
在 tum.de 的电子邮件经过验证
标题
引用次数
引用次数
年份
BIM-integrated collaborative robotics for application in building construction and maintenance
C Follini, V Magnago, K Freitag, M Terzer, C Marcher, M Riedl, A Giusti, ...
Robotics 10 (1), 2, 2020
722020
Combining the robot operating system with building information modeling for robotic applications in construction logistics
C Follini, M Terzer, C Marcher, A Giusti, DT Matt
Advances in Service and Industrial Robotics: Results of RAAD, 245-253, 2020
272020
A case study on regenerating informal settlements in Cairo using Affordable and Adaptable Building System
R Hu, C Follini, W Pan, T Linner, T Bock
Procedia engineering 196, 113-120, 2017
182017
BALTO: a BIM-integrated mobile robot manipulator for precise and autonomous disinfection in buildings against COVID-19
A Giusti, V Magnago, D Siegele, M Terzer, C Follini, S Garbin, C Marcher, ...
2021 IEEE 17th International Conference on Automation Science and …, 2021
132021
BIM-based construction progress measurement of non-repetitive HVAC installation works
P Dallasega, A Revolti, C Follini, CP Schimanski, DT Matt
Proceedings 27th Annual conference of the international group for lean …, 2019
122019
Design and development of a novel robotic gripper for automated scaffolding assembly
C Follini, AL Cheng, G Latorre, LF Amores
2018 IEEE Third Ecuador Technical Chapters Meeting (ETCM), 1-6, 2018
62018
Collaborative advanced building methodology toward industrialization of informal settlements in Cairo
C Follini, R Hu, W Pan, T Linner, T Bock
Proceedings of the 34th International Symposium on Automation and Robotics …, 2017
62017
Promoting collaborative construction process management by means of a normalized workload approach
CP Schimanski, C Marcher, P Dallasega, E Marengo, C Follini, ...
Proc. 26th Annual Conference of the International. Group for Lean …, 2018
42018
An Affordable and Adaptable Building System to Transform Informal Settlements in Cairo
R Hu, T Linner, C Follini, W Pan, T Bock
Proceedings of S. ARCH International Architecture Conference, 2018
22018
Development of a Methodology based on Requirements Engineering for Informal Settlements upgrading in Cairo
C Follini, W Pan, T Linner, W Nadim, T Bock
Proceedings of the CIB* IAARC W119 CIC 2016 Workshop, 2016
22016
Processing of use cases for the development of an open platform to support the smart urban development
A Schweigkofler, C Follini, D Steiner, K Romagnoli, M Riedl, DT Matt
IOP Conference Series: Earth and Environmental Science 297 (1), 012009, 2019
12019
A²L-Mobilius (Affordable and Adjustable Living and Mobility for sustainable Integrated Urban Systems in Egypt
T Linner, R Hu, W Pan, C Follini, T Bock
2018
Uso dell’openBIM per la navigazione robotica in cantiere
C Follini, D Matt, A Giusti
USO DEL DATO INTEROPERABILE ED APPROCCIO OPEN NEI PROCESSI INFORMATIVI DELLE …, 0
系统目前无法执行此操作,请稍后再试。
文章 1–13